FPSO Osagyefo shut down

The Osagyefo Kwame Nkrumah Floating Production Storage Offloading (FPSO) vessel which was shut down for a two-week maintenance work, will resume operations this Saturday, April 9.

The vessel was shut down on March 20, for mandatory inspection and maintenance work to enhance its reliability.

A statement signed and issued by the Chief Executive of Ghana Grid Company Limited (GRIDCo), Mr. William Amuna, said power system engineers would continue to take steps to mitigate any adverse effects that would rise from the shutdown.

By Times Reporter

Print Friendly

Leave a Comment